Summary of Updates made for the RESET Air Standard for Interiors from v2.0 to v2.1:
- Changed Commercial Interiors to Interiors.
- Updated PM2.5 Default Target Threshold from 35 ug/m3 to 25 ug/m3.
- Removed CO from Target Threshold Requirements (added as optional).
- Officially introduces Trust & Transparency Score.
- Officially introduces Alternative Pathways.
- Introducing option to set Definable Targets for a project.
- Introducing option to use Non-Accredited Monitors.
- Introducing additional monitor installation options.
- Re-wrote introduction section.
- Re-ordered and cleaned up Monitoring Station Deployment Requirements.
- Removed Partial Certification.
- Cleaned up text and removed extraneous words and explanations.
Page by Page Updates
Table of Contents
- Removed “TM” from all instances of RESET
- Changed "Certification Approach" to “Purpose and Approach”
- Added "Structure and Requirements"
- Changed "Data Analysis Algorithm" to "Data Interval and Data Analysis Algorithm"
- Changed "Steps for Calculating Monitor Deployment" to "Monitoring Station Deployment Requirements"
- Added "Trust & Transparency Score"
- Added "Alternative Pathways"
2.2.0 Preface
- Cleaned and Updated Text
2.2.1 Introduction
- New page: Introduction
- What is RESET Air Standard for Interiors? (High-level Concept)
- What does it define? (Summary)
2.2.1.1 Purpose & Approach
- Purpose: What is the RESET Air Standard for Interiors for? To establish guidelines and rules for RESET Air Projects
- What is the approach? Performance-based, continuous monitoring data collection, non-prescriptive, and for New or Existing built environments
2.2.1.2 Typologies and Usage
- New page describing the two Typologies and how they are used
- Added Description of the two different standards (Interiors and Core & Shell)
- Added relationship between tenant and landlord
2.2.2 Performance Targets & Data Analysis
- Added Description of the two different standards (Interiors and Core & Shell)
- New summary page for Performance Targets and Data Analysis
2.2.2.1 Indoor Air Quality Performance Targets
- Updated PM2.5 target from 35 ug/m3 to 25 ug/m3
- removed CO from required
- Switched the position of CO2 and TVOC.
2.2.2.2 Adding Optional Parameters
- New page introducing the ability to include Optional Air Quality Parameters into projects
- CO has been moved to Optional Parameters
- New option to assign performance targets for temperature and relative humidity for RESET Air Comfort
2.2.2.3 Data Interval and Data Analysis Algorithm
- Updated text
- Text describing that Performance Targets act as thresholds in the data analysis algorithm
2.2.3 System Requirements for Data Collection
- New summary page for data provider and monitor requirements
- Text describing continuous monitoring requirements for data providers and monitors and how it connects to the RESET Cloud
2.2.3.1 Data Provider Requirements
- Updated text
- Text describing that Performance Targets act as thresholds in the data analysis algorithm
- Added a link to the RESET Directory
2.2.3.2 Monitor Requirements
- Simplified to not include Grade A and Grade C
- Added a link to the RESET Directory
2.2.4 Monitor Installation and Deployment
- New summary page for monitor installation and deployment
- Describe Monitor Installation and Monitor Deployment requirements
2.2.4.1 Monitor Installation Requirements
- Added that the monitors should be in the breathing zone, measured from the center of the monitor
- Separated more clearly into Required and Recommended
2.2.4.2 Monitoring Station Deployment Requirements
- Moved Step Four (Regularly Occupied Space Types) to Step 2
- Merged Step Two and Three, removed the Partial Certification concept
- Added a Step Five for Occupant Coverage
2.2.5 Certification Requirements and Process
- Introduces the different Audits
- Introduces the different project statuses
2.2.6 Trust & Transparency Score
- Introducing Trust & Transparency Score
- Needs to add link to the TT Score page on the RESET Website
2.2.7 Alternative Pathways
- Introducing Alternative Pathways officially
- How to introduce new Alternative Pathways
2.2.7.1 Typology: Residential
- Alternative Pathway for Residential Typology
2.2.7.2 Definable Targets
- Alternative Pathway to adjust Performance Targets
- Alternative actions for when TVOC is too high
- Adjustment of threshold can also be done by comparing unoccupied data vs. occupied data
2.2.7.3 Using Non-Accredited Monitors
- Alternative Pathway for using non-accredited monitors
2.2.7.4 Additional Monitor Installation Options
- Alternative Pathway for installing on the ceiling instead of breathing zone
- Updated Proof of Uniformity requirements to apply to monitor installation's alternative pathway
2.2.7.5 Alternative Occupancy Coverage
- Alternative Pathway for adjusting occupancy coverage
2.2.7.6 Extended Monitor Range
- Alternative Pathway for extending the monitor range above 500 sqm
- Merged Step Two and Three, removed the Partial Certification concept
- Added a Step Five for Occupant Coverage
2.2.8 Glossary
- Cover page for Glossary
- Cleaned up text
- Moved Proof of Uniformity specifics to related Alternative Pathway pages