The RESET Project accreditation process can be divided into 5 phases:
- 项目注册
- 文档审核
- 现场审核
- 数据审核
- 维护认证
以下内容可下载了解各个阶段的详细信息。
1. 项目注册
The first step towards RESET Waste Project Accreditation is registration. Registration includes the project's basic information, terms and service agreements, and payment.
注册流程如下:
- 前往:https://cloud.reset.build/
- 登录或注册新账户
- 注册项目
- 填写注册信息并递交项目边界
- 收到注册确认和报价
- 付款并可开始文档审核和现场审核流程
- 收到注册完成确认
Please note that the preparation and submittal of project documents and performance data must be managed by a RESET Accredited Professional (AP). The RESET AP will also be responsible for all certification-related communication between the project owner and GIGA during the certification review process.
The RESET Waste AP curriculum is currently in development.
2. 文档审核
Documentation Audit (referred to as Pre-deployment Documentation Review in the Certification Process PDFs) ensures that a project's proposed monitor deployment strategy meets the intent of RESET Waste. Passing the Documentation Audit is recommended prior to executing monitor deployment in a project.
文档审核流程如下:
- 前往 https://cloud.reset.build/
- 填写、上传和递交文档审核文件
- 提交审核
- 收到文档审核是否通过的回复。每个项目最多向RESET递交两次做审核。
文档审核需要以下信息:
Monitor and Data Provider
监测设备信息
Specification sheet(s) for all monitors deployed on the project, including manufacturer name, product name, and product model number/SKU.
数据提供商信息
Name of the data provider that will be utilized on the project. The data provider must be a RESET Accredited Data Provider.
Documentation Audit for Commercial Interiors and Core & Shell
Monitor Deployment Narrative
A brief, yet detailed narrative describing the circularity monitoring plan, including details on the space's waste management plans, recycling plans, and other meta information.
Floor Plans (and Elevation Plans for Core & Shell)
Annotated and dimensioned floor plan(s), including partitions, furniture, and millwork, that clearly indicate the project boundary and proposed location of circularity meters and monitors.
项目完成文档审核后,即成为 RESET Pre-Accredited 状态。
3. 现场审核
The Site Audit ensures that a project has complied to all the monitor, data provider, and installation requirements for a RESET Waste Project. A Site Audit is required after a project has completed installation of monitors according to the approved deployment plan. The Site Audit includes two parts: Documentation and On-Site/Virtual Inspection.
现场审核流程如下:
- 前往:https://cloud.reset.build/
- 填写、上传并递交现场审核相关文档
- 现场审核文档被 RESET 确认
- 安排并确认现场验证时间
- 现场验证
- 现场审核通过/失败确认
现场审核文档
现场审核文档需递交以下信息:
监测设备信息
项目安装的监测设备序列号。并确保监测设备已经向 RESET Cloud 成功发送数据。
监测设备安装照片
所有安装后监测设备照片,并在平面图上标出相应位置。这用来确认在现场验证前监测设备已被安装。
使用时间
Define the days and hours in which the space is regularly occupied. RESET uses Hours of Occupancy for benchmarking purposes.
项目照片
该项目将被 RESET 展示。至少需要一张专业的项目图片。
现场/线上虚拟验证是指 RESET 审核员或 RESET 团队确认现场所有的监测设备根据已批准的监测设备布置图完成安装。
4. 数据审核
The Data Audit involves submitting data to the RESET Cloud. The Data Audit consists of a daily review of performance data sent to the RESET Cloud for compliance with the Standard.
数据审核流程如下:
- Connect the project’s RESET Accredited Data Provider to the RESET Cloud and confirm that the data is being transferred to the RESET Cloud
- 前往 RESET 云(https://cloud.reset.build/),进入您的项目,选择开始数据审核的月份。一个审核月份将从月首开始。
- Receive reports every month on the performance and benchmarking analysis of the project.
项目完成现场审核后和开始了数据审核,即成为 RESET Accredited 状态。
5. Maintaining Accreditation
RESET Waste Projects are required to continue an ongoing Data Audit. The ongoing Data Audit ensures that data is continuously monitored according to the RESET Waste Standard.
Requirements for Maintaining Accreditation
Continuous Monitoring via Data Audit
Continuous monitoring via the Data Audit must be maintained indefinitely as long as the project wants to remain Accredited. Projects are assessed and benchmarked on a monthly basis based on the circularity data submitted to the RESET Cloud.
数据审核年费
Accreditation status requires an active Data Audit. The Data Audit requires an annual recurring Data Audit fee. Note that the Data Audit fee encompasses all the Data Audits needed for a project, so it only needs to be paid once when applying multiple RESET Standards to a project.
Communication and Education
Averaged data must be made available to project occupants in some form (i.e. publicly available screens, desktop, or mobile app). Non-occupants need not have access to the data.
认证撤销条件
Data Missing
If the project is missing too much data, it is possible for the project's Accredited status to be revoked.
未能续费
如果项目未能支付再认证年费,则将撤销认证。.