This project includes building B and building C. The building area B is 96,983 square meters, 80 meters high, 18 floors above ground, the 19th floor for the machine room floor, and 4 floors underground. The building area C is 95,000 square meters, with a height of 70 meters. It has 17 floors above ground, 18th floor for the machine room and 2 floors underground. The space applied for RESET Air Commercial Inteiror Certification is the public area of the project, and the parking floor and the machine room floor are removed. The public area of the building B is 5,265 square meters. The public area of the building C is 6,894 square meters. The total of the public area of the project is 12,159 square meters.
Other Certifications
LEED EB
Project Information
RESET Air
Case Studies
Below are links to case studies for this project:
2023-07-28 | What is the RESET Air you breathe at work? Embracing the RESET Air Standard allows Raycom Infotech Park to cultivate a dynamic and healthy office environment. AirSolutions |
2023-07-28 | 你上班时呼吸的RESET Air究竟是什么Air? 被 RESET 认证过的空气,让头脑时刻清醒,让灵感自由释放! AirSolutions |